CBBT Parallel Thimble Shoal Tunnel*
Traffic Signal Design, Maintenance of Traffic
Mr. Newberger served on the subconsultant team for this project, which included design and construction of a new one-mile, two-lane tunnel under Thimble Shoal Channel. The new tunnel will carry two lanes of traffic southbound and the existing tunnel will carry two lanes of traffic northbound. Mr. Newberger oversaw the development of traffic signal and maintenance of traffic plans. Signal work included design plans, electrical plans, specification and calculations for the traffic and lane use management signals, controller installations, cabinets and all necessary equipment for the required functionality and controller signal electrification and communications including pathway and wiring requirements.
Maintenance of traffic tasks included preparation of MOT and construction staging schemes for each work area, traffic schemes for temporary work zones, coordination with the JV team on the preparation of the Traffic Management Plan, and coordination with the approach structures design team for staging in the approach roadways.